Sign In / Register
Make This My Home Page | Feedback |RSS
You are here: IE »   Story

123, go?

  • Print
  • Mail This Article
  • Comments
  • Add to favorites
  • G. Balachandran
    Personal Loan

    India’s strategic nuclear programme

    The Indian strategic programme is a long-standing one and is one of the pillars of Indian national security paradigm under the current international political environment. This strategic programme is critically dependent on, one, the Indian technical capabilities, two, the availability of nuclear material for the strategic programme, and three, the availability of delivery systems, especially missiles.

    The technical capabilities may involve both theoretical and experimental programmes, in both nuclear and non-nuclear components and systems. The nuclear material for the nuclear devices can be both of weapons-grade material and the non-weapon grade, primarily reactor-grade Plutonium (Pu). The weapons-grade material is obtained from two reactors CIRUS and Dhruva and the reactor-grade Pu from the unsafeguarded indigenous reactors. How will the environment be affected by the agreement? (See Table 2)

    Ads by Google

    India’s civil nuclear programme

    The Indian civil nuclear programme is concerned with the development and construction of nuclear power reactors for electricity generation and possibly other civil uses. The three-stage programme consists of the first stage Pressurised Heavy Water Reactors (PHWR) fuelled with natural uranium, the second stage Fast Breeder Reactors (FBR) fuelled with Pu and the third stage Thorium reactors. The current estimate of natural uranium reserves in India will satisfy the requirements of 10,000 MWe PHWR capacity. The Pu will come from the reprocessing of spent fuel from the PHWR and Light Water Reactors (LWR) that may be imported. How will they be affected?

    The Department of Atomic Energy (DAE) in their projections for the civil nuclear programme in India had projected that with only an additional import of 6 GWe (6000 MWe) of LWR till 2020, the contribution of nuclear power generation can increase from 208 GWe to 275 GWe by 2052! (See Table 3)

    ... contd.

    PreviousNext123

    Be the first to comment.

    Post a Comment
    Name:
    Email:
    Title:
    Maximum characters allowed     
    Comment:
    TERMS OF USE:
    The views, opinions and comments posted are your, and are not endorsed by this website. You shall be solely responsible for the comment posted here. The website reserves the right to delete, reject, or otherwise remove any views, opinions and comments posted or part thereof. You shall ensure that the comment is not inflammatory, abusive, derogatory, defamatory &/or obscene, or contain pornographic matter and/or does not constitute hate mail, or violate privacy of any person (s) or breach confidentiality or otherwise is illegal, immoral or contrary to public policy. Nor should it contain anything infringing copyright &/or intellectual property rights of any person(s).
    I agree to the terms of use.