Sign In / Register
Make This My Home Page | Feedback |RSS
You are here: IE »   Story

Kasab safety first, work on monorail project later

  • Print
  • Mail This Article
  • Comments
  • Add to favorites
  • Kasab
    Kasab Trial
    The Mumbai Police have requested the Mumbai Metropolitan Region Development Authority (MMRDA) to go slow on part of the construction of the country’s first monorail project, for fear that it would put the safety of terrorist Ajmal Kasab in jeopardy.

    Part of the monorail is coming up on N M Joshi Marg and Sane Guruji Marg, where Arthur Road Jail is located. Kasab is lodged in the jail and is being tried in a special court on the premises.

    The police have urged the MMRDA not to carry out any major work on this section. Work there would entail barricading a portion of the road while constructing the cross-section. This would lead to traffic congestion.

    “N M Joshi Marg and Sane Guruji Marg are places where underground utilities are complicated and numerous. We have been requested informally not to carry out any major work at N M Joshi Marg till the 26/11 trial ends,” an MMRDA official said, on condition of anonymity.

    Ads by Google

    “Since that patch has the highest number of underground utilities, we have decided to conduct a preliminary study so that we can start the work once the trial gets over,” the official added.

    Underground utilities have posed problems for a number of infrastructure projects. The MMRDA and the Brihanmumbai Municipal Corporation got into a tussle in May, after a pipeline burst during the construction of a flyover near Bharat Mata Junction.

    Sources said the request to go slow would not delay the project. The police expect a speedy trial in the 26/11 case while the monorail has time to go before the scheduled commissioning of the first link (Chembur to Wadala) in November 2010 and the second (Wadala to Jacob Circle) in April 2011. N M Joshi and Sane Guruji Marg are part of the second link.

    Mumbai Police Commissioner D Sivanandan said he is unaware of the request. “I am not aware of this but the police may have asked them to do so as security of Ajmal Kasab during the trial is paramount at this moment.”

    A heavy security cordon has been thrown around the jail ever since Kasab was lodged there. The Indo-Tibetan Border Police and Mumbai Police personnel guard the jail round the clock, with vantage points in nearby buildings also having been secured.

    The 20 km monorail project, the first in the country, is being constructed by a joint venture of Malaysia based Scomi and Larsen and Toubro at a cost of Rs 2,460 crore. Work will be done at five places: Saibaba Road, Mint Colony, Wadala, Bhakti Park and R C Marg.

    The Chinchpokli station would be coming up near the Arthur Road Jail.

    Comments
    Post comment

    Be the first to comment.

    Post a Comment
    Name:
    Email:
    Title:
    Maximum characters allowed     
    Comment:
    TERMS OF USE:
    The views, opinions and comments posted are your, and are not endorsed by this website. You shall be solely responsible for the comment posted here. The website reserves the right to delete, reject, or otherwise remove any views, opinions and comments posted or part thereof. You shall ensure that the comment is not inflammatory, abusive, derogatory, defamatory &/or obscene, or contain pornographic matter and/or does not constitute hate mail, or violate privacy of any person (s) or breach confidentiality or otherwise is illegal, immoral or contrary to public policy. Nor should it contain anything infringing copyright &/or intellectual property rights of any person(s).
    I agree to the terms of use.