Premium
This is an archive article published on June 6, 2008

LCA needs new engine to be worthy of combat

The home-grown Tejas Light Combat Aircraft, which is set to be inducted in 2011, will not be able to fly with a full-weapon load...

.

The home-grown Tejas Light Combat Aircraft (LCA), which is set to be inducted in 2011, will not be able to fly with a full-weapon load and will also need a new engine—instead of the Kaveri engine—to meet the minimum requirements for fighter aircraft drawn up by the Indian Air Force (IAF). To accommodate these modifications, the planes will also need to be redesigned.

In what could be a deathblow to the indigenous fighter programme, the Ministry of Defence (MoD) has conceded that the first lot of planes to enter service will not only carry a limited load of weapons but will also have a restricted ‘angle of attack’, making them unsuitable for aerial combat.

The primary reason for the problem is the lower thrust provided by the GE 404 engine powering the aircraft. While plans to develop a newer engine are under discussion, there is no scope for improvement at least for the first lot of 40 aircraft, of which 20 have already been ordered by the IAF. “There is no way that the first 40 aircraft will have any other engine than the GE 404. The engine gives a power of 80-85 Kilo Newton while the IAF requires them to have a capability of 95-100 Kilo Newton,” a top MoD source said, adding that the current thrust provided by the engine limits the angle of attack — a measure of the maneouverability of the aircraft—to 17 degrees against the IAF’s minimum requirement of 21 degrees. This makes the fighter unsuitable for aerial combat, especially given that neighbouring countries already possess more agile fighter planes.

Story continues below this ad

With the IAF not willing to introduce any more such ‘limited’ fighters, plans are afoot to give the LCA a new engine with greater thrust. However, this would also require a complete redesign. “To put in a new engine, like the GE 414, with this capability, the existing structure of the aircraft will have to be modified. This would need design changes that will take another 3-4 years,” the source said.

However, India is yet to decide whether to go in for a completely imported engine or jointly develop an engine with a leading international player. With the Kaveri engine making little headway, India is planning to rope in manufacturers like General Electric (US), Snecma (France), Rolls Royce (UK) and NPO Saturn (Russia) for the project.

Latest Comment
Post Comment
Read Comments
Advertisement
Advertisement
Advertisement
Advertisement