
That the credulity of even the authors of the report was being strained is obvious from the note they add to this table. They record, “These estimates assume that:
“the FBR (Fast Breeder Reactor) technology is successfully demonstrated by the 500 MW PFBR (Prototype Fast Breeder Reactor) currently under construction,
“new uranium mines are opened for providing fuel for setting up additional PHWRs (Pressurised Heavy Water Reactors),
“India succeeds in assimilating the LWR (Light Water Reactor) technology through import and develops the Advanced Heavy Water Reactor for utilising Thorium by 2020.”
Anyone who has the least familiarity with what the Times of India would have called ‘bureaucratese’ will see through to the extreme skepticism that the authors — heavily pressurised reactors, if I may say so — are trying to convey. By the time three pages have passed, the pressure has taken the better of the reactors: in listing “some energy supply scenarios for 8 per cent GDP growth”, they go for “maximum nuclear”, which they say “assumes nuclear development as per the optimistic scenario of Table 3.4.” The “pessimistic scenario”? Press “Del” for delete!
That apart, what would we have to do to get from 20,000 MW in 2020 to 63,000 MW by 2030 — that is, how do we add 43,000 MW in 10 years? If we put up 500 MW reactors, that will require that we put up over 80 reactors in 120 months: that is, we bring into operation one reactor every one and a half months; if we put up 1000 MW reactors, that will require over 40 reactors — that is, we bring into operation one reactor every three months.
... contd.